Skip to main content

Lend Lease

Sunset over a marina and glass buildingsLend Lease faces the challenge of delivering Green Star rated buildings within tightly constrained budgets and timeframes. To this end, Fujitsu and Switch Automation collaborated in designing a solution to comply with the energy monitoring aspects of the Green Star rating design criteria. A key project priority was to monitor environmental controls and provide real-time energy usage metrics. Another challenge was to develop a means of utilizing single high speed IP fibre cabling network to replace traditional multiple, non-IP copper cabling infrastructures.

"The time is not far off when companies will have to justify their worth to society with greater emphasis being placed on environmental and social impact than straight economics." Dick Dusseldorp , Founder, Lend Lease, 1973

Download the LendLease case study (571 KB)