Skip to main content
  1. Home >
  2. O společnosti >
  3. Případové studie>
  4. MTU Maintenance is on the safe side with the Fujitsu Modular Data Center

MTU Maintenance is on the safe side with the Fujitsu Modular Data Center

"The professionalism shown by Fujitsu during the implementation of the project completely fulfilled our high expectations."

Michael Czernik, Lead Buyer, Central Purchasing, MTU Aero Engines AG

The customer

MTU Maintenance is part of one of the world’s largest independent providers of maintenance services for civil aircraft engines. As a subsidiary of MTU Aero Engines, the company benefits from almost 100 years of experience in developing and manufacturing aircraft engines. MTU Maintenance’s portfolio includes service packages and complete solutions for a wide range of modern engines. It covers everything from small business jet engines to large ones for the Airbus A380. Its range also includes maintenance and repair services for industrial gas turbines and auxiliary equipment. The MTU Maintenance Hannover GmbH site is the largest in the MTU Maintenance Group and is responsible for maintaining and repairing medium to large sized civil aircraft engines.

The challenge

Due to increased demand on the availability of its IT system and high growth in its database volumes, MTU Maintenance wanted to replace an existing server room at its site in Hanover.

The solution

Creating a Fujitsu Modular Data Center. The Fujitsu Modular Data Center turnkey security solution offers excellent flexibility whilst maintaining the highest possible security standards for the building services within the container at an attractive price.

The benefit

  • The entire solution is extremely flexible
  • High security standards
  • Attractive price
  • Project realized very quickly (in this case approx. 12 weeks from placing the order to completion)
  • Everything from a single source (solution and services)
  • Innovative, highly effective technology (UPS), efficient direct passive cooling and coolants that comply with the Kyoto Protocol


Read the full MTU Maintenance case study (128 KB/A4, 2 pages)