Fujitsu conducts soil and groundwater contamination surveys, implements countermeasures, and discloses the resulting data.
We review as necessary our internal rules established in FY 2006 in response to soil and groundwater problems, and will handle such problems based on these revised rules for soil and groundwater surveys, policies, and disclosure. In the future, in parallel with performing planned surveys and, if contamination is discovered, implementing cleanup operations and countermeasures appropriate for the conditions at each business site, we will also disclose relevant information in collaboration with administrative agency.
A voluntary survey in FY 2012 revealed soil and groundwater contamination at two sites. We reported the state of contamination at this site and explained our countermeasures to administrative agency.
We have dug wells to monitor groundwater contamination near our sites where soil or groundwater pollution has been found. We continuously monitored eight such sites in FY 2012.
The table below lists the largest of the most recent measurements for chemicals with levels recognized to have exceeded regulated levels in FY 2012 stemming from past business activities.
Site Name | Location | Cleanup and Countermeasure status | Monitoring Well Maximum Value (mg/l) | Regulated Level (mg/l) | |
---|---|---|---|---|---|
Substance | Measured Value | ||||
Kawasaki Plant | Kawasaki City,
Kanagawa Prefecture |
We are continuing to clean up VOCs by pumping and aeration. | Cis-1, 2-dichloroethylene | 3.0 | 0.04 |
Oyama Plant | Oyama City,
Tochigi Prefecture |
We are continuing to clean up VOCs by pumping and aeration. | Cis-1, 2-dichloroethylene | 4.275 | 0.04 |
Trichloroethylene | 0.048 | 0.03 | |||
1,1- dichloroethylene | 0.032 | 0.02 | |||
Nagano Plant | Nagano City,
Nagano Prefecture |
We are continuing to clean up VOCs by pumping and aeration. | Cis-1, 2-dichloroethylene | 0.16 | 0.04 |
Suzaka Plant | Suzaka City,
Nagano Prefecture |
We have begun construction of an underground impervious wall and facilities for processing pumped water. | Polychlorinated biphenyl | 0.021 | Must not be detected |
Fujitsu Interconnect Technologies
Kurohime Office (Formerly Shinetsu Fujitsu) |
Shinano machi,
Kamiminochi Gun, Nagano Prefecture |
We are continuing to clean up VOCs by pumping and aeration. | Cis-1, 2-dichloroethylene | 0.12 | 0.04 |
Fujitsu Optical Components | Oyama City,
Tochigi Prefecture |
We are continuing to clean up VOCs by pumping and aeration. | Cis-1, 2-dichloroethylene | 0.114 | 0.04 |
Trichloroethylene | 0.18 | 0.03 | |||
FDK Sanyo plant | Sanyo-Onoda City,
Yamaguchi Prefecture |
We are continuing to clean up VOCs by pumping and aeration. | 1, 2-dichloroethylene*1 | 0.11 | 0.04 |
Cis-1, 2-dichloroethylene | 0.053 | 0.04 | |||
Trichloroethylene | 0.090 | 0.03 | |||
FDK Energy
(Formerly the FDK Washizu Plant) |
Kosai City,
Shizuoka Prefecture |
We are continuing to clean up VOCs by pumping and aeration. | Trichloroethylene | 0.35 | 0.03 |
Tetrachloroethylene | 0.41 | 0.01 | |||
Cis-1, 2-dichloroethylene | 0.71 | 0.04 |
*1 1, 2-dichloroethylene:
The analysis item was changed from "Cis-1, 2-dichloroethylene" to "1, 2-dichloroethylene" in accordance with the guidance of administrative agency in October.